成都地铁2号线犀浦站换乘改造分析  

The analysis of the design of xipu transfer station

在线阅读下载全文

作  者:张晶晶 Zhang Jingjing(China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Chengdu Sichuan 610000,China)

机构地区:[1]中铁第五勘察设计院集团有限公司,四川成都610000

出  处:《山西建筑》2023年第19期135-138,共4页Shanxi Architecture

摘  要:近年来,地铁线网随着城市的快速发展不断加密更新,部分地铁车站的功能发生相应变化。为适应新线网需求,需在避免过多的工程废弃,提高市民出行的便捷、舒适度的基础上对此部分车站进行换乘改造。以成都地铁犀浦站项目为依托,结合新建6号线换乘接入条件,对既有2号线车站进行了换乘改造分析。旨在通过换乘改造,达到改善既有犀浦站拥堵现状,实现该站国铁、地铁2号、6号线三线便捷换乘的目的。In recent years,with the rapid development of the city,the subway network density continuously increased,and the functions of some subway stations changed as well.In order to adapt these changes and improve the people’convenience and comfort of transfer surroundings,it’s necessary to transform these stations while avoiding the resources wastes due to rebuilding.Taking Xipu station project of the Chengdu Metro as an example,this paper analyses the design of transfer at Xipu station,focusing on Line 2 and Line 6,which is aim to solve the problem of congestion and builds a convenient and fast transfer station for National Rail,Line 2 and Line 6.

关 键 词:地铁线网 换乘改造 三线换乘 

分 类 号:TU248.2[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象