检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾亚锋 JIA Yafeng(Ruzhou Zhengtie Sanjia Cement Products Co.,Ltd.,Ruzhou 467500,Henan China)
机构地区:[1]汝州郑铁三佳水泥制品有限公司,河南汝州467500
出 处:《锻压装备与制造技术》2023年第4期130-135,共6页China Metalforming Equipment & Manufacturing Technology
摘 要:采用先张法生产混凝土轨枕时,为了一次成型多个轨枕以提高生产效率,需要人工在轨枕成型钢模中放置多个挡板将钢模分隔开,为此需大量人工合力将钢筋组抬入钢模内,工人劳动强度大,工作效率低。本文提出一种轨枕预应力钢丝自动编组装置和入模系统及技术,能够自动将挡板分置到位,自动将轨枕预应力钢丝编组并送入钢模,自动化程度高,降低劳动强度,省工省时,提高工作效率,降低生产成本。When using the pre-tensioning method to produce concrete sleepers,in order to form multiple sleepers at once to improve production efficiency,it is necessary to manually place multiple baffles in the forming steel die of the sleepers to separate the steel die.A large amount of manual force is required to lift the steel reinforcement group into the steel mold,resulting in high labor intensity and low work efficiency for workers.An automatic grouping device and die-entry system and technology for pre-stressed steel wire of sleepers have been proposed,which can automatically separate the baffle in place,automatically group and feed the pre-stressed steel wire of sleepers into the steel die,with a high degree of automation,reducing labor intensity,saving labor and time,improving work efficiency,and reducing production costs.
分 类 号:TG945[金属学及工艺—钳工工艺]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7