考虑采动影响的ACI-RMR法矿山巷道围岩质量分级研究  被引量:8

Quality Classification for Roadway Surrounding Rock by ACI-RMR Method Considering the Influence of Mining

在线阅读下载全文

作  者:葛伟杰 刘艳章[1,2] 秦绍兵 黄诗冰[1,2] 肖一鸣 单梁 GE Weijie;LIU Yanzhang;QIN Shaobing;HUANG Shibing;XIAO Yiming;SHAN Liang(School of Resources and Environmental Engineering,Wuhan University of Science and Technology,Wuhan 430081,China;Hubei Key Laboratory for Efficient Utilization and Agglomeration of Metallurgic Mineral Resources,Wuhan 430081,China;Sinosteel Corporation Wuhan Safety and Environmental Protection Research Institute,Wuhan 430081,China)

机构地区:[1]武汉科技大学资源与环境工程学院,武汉430081 [2]冶金矿产资源高效利用与造块湖北省重点实验室,武汉430081 [3]中钢集团武汉安全环保研究院有限公司,武汉430081

出  处:《有色金属工程》2023年第9期121-129,共9页Nonferrous Metals Engineering

基  金:国家自然科学基金资助项目(42072300)。

摘  要:为了充分反映矿山开采过程中开采扰动对巷道围岩质量的影响,在传统岩体质量分级RMR法的基础上引入巷道埋深、巷道存续时间、巷道高跨比、巷道间柱宽度和分段高度等5个采动影响指标,构建采动影响巷道围岩质量分级指标体系。引入拉格朗日乘子法耦合层次分析法(AHP)和CRITIC法对各指标进行组合赋权,将该组合权重导入理想点法(IPM)构建考虑采动影响的AHP-CRITIC-IPM改进RMR法(ACI-RMR法),将ACI-RMR法应用于某金属矿山进路巷道围岩质量分级并与RMR法分级结果进行对比。结果表明:部分测点的ACI-RMR法分级结果较RMR法分级结果出现等级降低或相同等级评分值下降的情况,结合工程实际证明ACI-RMR法较RMR法更能反映开采扰动对巷道围岩质量的影响,为矿山安全生产与设计提供参考。In order to fully reflect the impact of mining disturbances on the quality of roadway surrounding rock during the mining process,five mining impact indicators,including roadway burial depth,roadway survival time,roadway height to span ratio,column width between roadways,and section height,were introduced on the basis of the traditional rock mass quality classification RMR method.A mining impact roadway surrounding rock quality classification index system was constructed.The Lagrange multiplier method coupled with analytic hierarchy process(AHP)and CRITIC method was introduced to give combined weights to each index,and the combined weights were introduced into the ideal point method(IPM)to build the AHP-CRITIC-IPM improved RMR method(ACI-RMR method)considering the impact of mining.The ACI-RMR method was applied to the quality classification of surrounding rock in a metal mine drift and the classification results were compared with the RMR method.The research results showed that compared with the results of RMR method,the results of ACI-RMR method was reduced or the score value of the same grade was decreased at some measuring points.Based on engineering practice,it has been proved that the ACI-RMR method can better reflect the impact of mining disturbance on the quality of roadway surrounding rock compared to the RMR method and provide a reference for mine safety production and design.

关 键 词:采动影响 ACI-RMR法 层次分析法 组合赋权 理想点法 

分 类 号:TD313[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象