检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李力 王维 LI Li;WANG Wei(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2023年第9期74-78,共5页Hydropower and New Energy
摘 要:介绍了水布垭电厂水轮发电机组镜板泵效率低,推力瓦温较高的问题,分析其原因,研究取消原镜板泵循环结构,采用外加油泵外循环系统。更换新集油槽,增加梳齿密封隔油板,根据进出油管路配置下机架及推力油槽,每台油冷却器支路设置一组互为备用的电动油泵、压力开关、流量开关、阀门、管路及附件等,并优化布置,确保各管路部件的可靠连接,且便于检修维护。3台机组的推力瓦温得到了有效降低,表明改造措施有效。The thrust runner collar pump used in hydro-turbine generator units in Shuibuya Hydropower Plant is of unsatisfactory performance,resulting in high temperature of the thrust pads.Thus,the original collar pump circulation structure is replaced by external circulation system with external pump.Also,the oil collecting groove is replaced and comb shaped sealing oil separation plates are added.The lower bracket of the units and the thrust oil groove are arranged according to the practical configurations of the inlet and outlet oil pipelines.In each oil cooler branch,a set of mutually backup electric oil pumps,pressure switches,flow switches,valves,pipelines and accessories is equipped,and their arrangement is optimized to ensure the reliable connection of the pipeline components and to facilitate the maintenance.The thrust pad temperature of the units is effectively reduced,indicating that the renovation if successful.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.125.13