检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郝杰[1] 李延奇 翟德平 王书礼 HAO Jie;LI Yan-qi;ZHAI De-ping;WANG Shu-li(Coal preparation of Pingdingshan Tianan No.8 Coal Co.Ltd,Pingdingshan,Henan 467000,China;Weihai Haiwang Cyclone Co.Ltd,Weihai,Shandong 264203,China)
机构地区:[1]平顶山天安煤业股份有限公司八矿选煤厂,河南平顶山467000 [2]威海市海王旋流器有限公司,山东威海264203
出 处:《煤炭加工与综合利用》2023年第7期4-7,共4页Coal Processing & Comprehensive Utilization
摘 要:针对平煤八矿选煤厂存在的介耗偏高问题,分析了影响现场介耗指标的主要因素,介绍了一种高效预脱介设备—固定筛,并对原有预脱介弧形筛进行替换改造。应用结果表明,固定筛具有脱介效率高、运行稳定的优点,大大降低工人更换筛板频率的同时,生产吨煤介耗降低至0.6 kg以内,经济效益显著。In view of the problem of high media consumption in the coal washing plant of No.8 Coal Mine,the main factors affecting the field mesial consumption index are analyzed,and an efficient pre-mediation equipment-fixed screen is introduced in this paper.The original de-media arc screen is replaced and reformed by a fixed screen.The application results show that the fixed screen has the advantages of high disconnection efficiency and operation stablility,greatly reducing the workload of workers to replace the arc sieve panels,and reducing the production consumption of coal to less than 0.6kg,which is of significant economic benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38