MINErosion 4:Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland,Australia  

在线阅读下载全文

作  者:Ashraf MKhalifa Hwat Bing So Hossein Ghadiri Chris Carroll Peter Burger Bofu Yu 

机构地区:[1]School of Engineering and Built Environment,Australian Rivers Institute,Grifith University,Nathan,4111,Queensland,Australia [2]School of Environment and Science,Australian Rivers Institute,Grifith University,Nathan,411,Queensland,Australia [3]Department of Natural Resources,Mines and Energy,Rockhampton,Queensland,Australia

出  处:《International Soil and Water Conservation Research》2023年第3期415-428,共14页国际水土保持研究(英文)

摘  要:The use of draglines to remove overburden in Queensland opencut mines,results in landscapes that consist of long parallel tertiary overburden spoil-piles that are generally highly saline,dispersive,and highly erodible.The height of these spoil-piles may exceed 50-60 m above the original landscapes and the slopes are at the angle of repose of around 75%or 37°.Legislation and public opinion require that these highly disturbed open-cut post-mining landscapes should be satisfactorily rehabilitated into an approved post-mining land use with acceptable erosion rates.Therefore,these slopes must be reduced before the landscape can be rehabilitated.The most expensive component of the rehabilitation process is the re-shaping and preparation of the overburden to create a suitable landscape for vegetation growth.As soils and overburden varies greatly in their erodibilities,the extent and cost of earthworks can be minimized,and rehabilitation failures avoided,if soil erosion from designed landscapes can be predicted using laboratory-based parameters prior to construction of these landscapes.This paper describes the development of a model for that purpose.A catchment or landscape erosion model MINErosion 4 was developed by upscaling the existing hillslope model MINErosion 3(So,et al.,2018)and integrate it with both ESRI ArcGIS 10.3 or QGIS 3.16(freeware),to predict event based and mean annual erosion rate from a postmining catchment or landscape.MINErosion 3 is a model that can be used to predict event and annual erosion rates from field scale hillslopes using laboratory measured erodibility parameters or routinely measured soil physical and chemical properties,and to derive suitable landscape design parameters(slope gradient,slope length and vegetation cover)that will result in acceptable erosion rates.But it cannot be used to predict the sediment delivery from catchments or landscapes.MINErosion 4 was validated against data collected on three instrumented catchments(up to 0.91 ha in size)on the Curragh mine site in Central

关 键 词:Soil erosion MINErosion 4 model Erosion from catchments Post-mining rehabilitation Queensland 

分 类 号:S157[农业科学—土壤学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象