摘  要:洞桩法是由桩、梁、柱共同形成的受力体系,其适用于城市地面施工空间少、跨度大的地铁车站施工中。边桩施工是洞桩法施工中较为重要的工序。因此,该文以沈阳三号街站暗挖洞桩法(Pile-Beam-Archmethod,PBA)地铁车站为工程背景,分析了车站主体结构施工存在的风险源,并对人工挖空护壁、泥浆拌制、桩成孔质量检查以及边桩管柱等边桩施工工艺进行了阐述。以期为同类工程提供借鉴。The hole pile method is a stress system formed by piles,beams and columns,which is suitable for the construction of metro stations with less construction space and large span on the urban ground.Side pile construction is an important process in hole pile construction.Based on the PBA construction method of Shenyang No.3 Street Subway Station as the engineering background,this paper analyzes the risk sources existing in the construction of the main structure of the station,and expounds the construction technology of the side pile,such as artificial hollowed-out wall protection,mud mixing,pile hole quality inspection,and side pile pipe column.In order to provide reference for similar projects.

关 键 词:PBA工法 车站主体结构 边桩 风险源 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象