检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王俊科 Wang Junke(Huaxin Zhongheng Engineering Project Consulting Co.,Ltd.,Chengdu,Sichuan 610000)
机构地区:[1]华信众恒工程项目咨询有限公司,四川成都610000
出 处:《现代工程科技》2023年第11期98-101,共4页Modern Engineering Technology
摘 要:结合某项目综合管廊工程实际,针对基坑肥槽作业面受限区域采用传统混凝土回填和预拌流态固化土回填进行对比分析。研究发现,得到了预拌流态固化土回填具有可利用原有出土、施工快速、质量较好的优点。同时,提出了流态固化土造价确定的方法。Based on the actual situation of a comprehensive pipe gallery project in a certain project,a comparative analysis was conducted on the use of traditional concrete backfilling and pre mixed fluidized solidified soil backfilling for the restricted area of the foundation pit fertilizer tank operation surface.Research has found that pre mixed fluidized solidified soil backfilling has the advantages of utilizing existing excavation,fast construction,and good quality.At the same time,a method for determining the cost of fluidized solidified soil was proposed.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145