作 者:何羽康 贾涛[1,2] 王能民[1,2] HE Yukang;JIA Tao;WANG Nengmin(School of Management,Xi’an Jiaotong University,Xi’an 710049,China;The Key Lab of the Ministry of Education for Process Management&Efficiency Engineering,Xi’an 710049,China)
机构地区:[1]西安交通大学管理学院,陕西西安710049 [2]过程管理与效率工程教育部重点实验室,陕西西安710049
出 处:《运筹与管理》2023年第8期38-43,共6页Operations Research and Management Science
基 金:国家社会科学基金资助项目(19BGL096)。
摘 要:现金流入与流出的动态平衡,对于承包商平稳实施项目具有重要的现实意义。本文基于这一实际背景,研究了在里程碑支付条件下,活动具有多种执行模式的多项目现金流平衡调度问题。首先,在对研究问题进行界定的基础上,构建了多模式多项目现金流平衡调度优化模型并提炼了模型的基本性质;其次,针对问题的NP-hard属性,开发了禁忌搜索启发式求解算法,根据问题性质提出算法的改进措施;最后,用一个实际案例对模型和算法进行了验证,得到如下管理启示:基于最大现金流缺口发生时段,适当延后相关里程碑活动的完成时间或调整相关非里程碑活动的开始时间,同时,根据现金流分布合理平移部分单项目的进度计划,能实现现金流出与流入的最佳匹配并有效减小最大现金流缺口。In reality,as projects are implemented,the contractors may incur a series of cash flows occurring in the following two forms:Cash outflows are induced mainly by activity execution while cash inflows generally result from payments based upon the contract between the contractor and the client.It is easy to understand that throughout the projects,maintaining a positive balance between cash outflows and inflows is very important for the contractor,because if the outflows cannot be covered by the inflows in time,the contractor may not be able to smoothly implement the projects or may even incur project failure.However,in the area of project scheduling,although there exist a lot of researches that take cash flows into account,most of them focus on the problem of how to maximize the net present value of the projects’cash flows.To the best of our knowledge,the multi-project scheduling problem with the objective of balancing the cash flows positively has not been studied intensively thus far.Based on the facts aforementioned,this paper investigates a milestone payment based multi-mode multi-project cash flow balance scheduling problem,in which the contractor needs to implement multiple projects concurrently,activities can be performed with several discrete modes,and the objective is to minimize the maximal cash flow gap under the constraint of project deadline.First,on the basis of the problem definition,we construct a nonlinear integer programming optimization model for the studied problem using the defined notations.In the model,the decision variables are the arrangement of the execution mode and start time of activities whereas the constraints include the precedence relationship between activities,project deadlines,calculation formulae of payment amounts,and definition domain of decision variables.Through the analysis of the constructed model,we proposed three properties for the problem,which can be employed to determine the maximal cash flow gap under a given schedule conveniently and reduce this gap by adjusting th
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.142.123