检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高龙龙 韩文民[1] GAO Longlong;HAN Wenmin(School of Economics and Management,Jiangsu University of Science and Technology,Zhenjiang 212100,China)
机构地区:[1]江苏科技大学经济管理学院,江苏镇江212100
出 处:《运筹与管理》2023年第8期71-77,共7页Operations Research and Management Science
基 金:国家自然科学基金资助项目(71271105);江苏省研究生科研创新计划项目(SJKY19_2594)。
摘 要:针对以往虚拟单元调度相关研究忽略了单元内外运输能力的限制、空载运输时间,以及对并行机的异质性考虑不够充分等问题,本研究以最大完工时间最小和总运输时间最短为目标,构建了虚拟单元运输组织与异质并行机调度联合决策模型,并提出了改进的NSGA-Ⅱ算法对模型进行求解。所提算法将粒子群算法与NSGA-Ⅱ的交叉、变异过程相融合,提高了算法的收敛速度。并将模拟退火算法的进化机制应用于NSGA-Ⅱ的变异过程,避免了NSGA-Ⅱ容易陷入局部最优的问题。通过小、中、大规模算例的仿真实验发现,所提算法与标准的NSGA-Ⅱ相比,算法的鲁棒性、收敛性和解集的质量、多样性等方面表现出较高的优势。As an important branch of flexible manufacturing,the virtual manufacturing cell(hereafter referred to as“virtual cell”)has attracted much attention in recent years.The virtual cell refers to the formation of a logical production cell by selecting the required equipment from alternative equipment resources based on the similarity of production tasks and considering the production conditions or constraints,and forming a logically interrelated virtual dynamic production entity by connecting the logistics system without changing the physical layout of equipment and resources,which has the advantages of reducing production preparation time and work-in-process inventory and improving equipment utilization.The virtual cell is mostly used in the production of large and complex products,whose production and logistics organization are complex,and the transportation of workpieces is mostly done with large transportation equipment such as flatbed transporters,traveling cranes and forklifts.It can be seen that the effective implementation of the virtual cell depends on the effective flow of the production logistics system,and the transportation organization has an important impact on the effective development and implementation of the scheduling scheme.Existing studies related to virtual cells ignore the influence of factors such as intra-and inter-transport capacity and non-load transport time,and the heterogeneity of parallel machines is not considered sufficient.These factors affect the recycling and availability of transportation equipment,which affects the continuity of production logistics and utilization of processing equipment.Consequently,the scheduling scheme often departs substantially from the actual production organization process or even is not even feasible.In summary,this paper constructs a joint decision model of transportation organization and heterogeneous parallel machine scheduling under the constrained transportation capacity the intra-and inter-virtual cell,non-load transportation time and heterogen
关 键 词:虚拟制造单元 调度 生产物流 异质并行机 NSGA-Ⅱ
分 类 号:TP18[自动化与计算机技术—控制理论与控制工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7