检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘亚辉 刘敏 刘莉娜 PAN Yahui;LIU Min;LIU Lina(Hubei Institute of Water Resources Survey and Design Co.,Ltd.,Wuhan 430063,Hubei,China)
机构地区:[1]湖北省水利水电规划勘测设计院有限公司,湖北武汉430063
出 处:《工程技术研究》2023年第13期36-38,共3页Engineering and Technological Research
摘 要:为了提升水电站道路设计水平,文章总结了DEM模型的数据采集和建模方法,并基于规则格网、不规则三角网分别建立道路土石方计算模型。同时,以某水电站进场道路为研究对象,将基于DEM模型计算的土石方工程量与平均断面法进行对比,研究成果表明,DEM模型能更好地拟合地形和道路线形,计算的土石方数量更准确。In order to improve the design level of the hydropower station roads,the data acquisition and modeling methods of the DEM model are summarized,and the road earthwork calculation model is established based on the regular grid and the Triangulated Irregular Network.At the same time,taking the access road of a hydropower station as the research object,the earthwork quantity calculated based on DEM model is compared with the average cross section method.The research results show that the DEM model can better fit the terrain and road alignment,and the calculated earthwork quantity is more accurate.
关 键 词:DEM模型 水电站道路 数据采集 土石方 计算模型
分 类 号:TV541[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7