检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:窦鹏 王志伟 叶琳 DOU Peng;WANG Zhi-wei;YE lin(Beijing Urban Construction Group Co.,Ltd.,100088,Beijing,China)
出 处:《建筑技术》2023年第17期2088-2090,共3页Architecture Technology
摘 要:某特大型综合博物馆采用大跨度弧形空间设计,机电工程管线密集复杂,采用综合支吊架施工可保证管线走线清晰明朗,提升安装质量,有效控制标高。利用BIM技术对管廊区域全专业管线进行合理排布,在此模型基础上进行综合支吊架校核计算,出具施工指导图纸,可有效提高安装效率,节约成本,形成综合支吊架施工过程中的选型标准化流程。This project is a large-scale comprehensive museum,which adopts large-span arc space design,electromechanical engineering pipelines are dense and complex,the construction of composite support and hanger can ensure clear pipeline alignment and improve installation quality,effective control of elevation.BIM technology is used to arrange all professional pipelines in the pipeline corridor area reasonably,on the basis of this model,the comprehensive support and hanger checking calculation is carried out,and the construction guidance drawings are issued,which can effectively improve the installation efficiency and save the cost,formed in the comprehensive support hanger construction process selection standardization process.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28