检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾成亮[1] 王志伟 叶林 JIA Cheng-liang;WANG Zhi-wei;YE Lin(Beijing Urban Construction Group Co.,Ltd.,100088,Beijing,China)
出 处:《建筑技术》2023年第17期2091-2092,共2页Architecture Technology
摘 要:在工程建设中,母线穿越隔振沟是确保整个工程质量的重要因素之一。随着大楼隔振措施越来越普遍,需要对电气设备穿越隔振沟、隔振层,采取有效措施,满足功能使用,确保工程质量。本研究介绍母线槽穿越隔振沟的几种技术分析,并结合相关规范要求,作出具体技术分析。The bus duct crossing vibration isolation trench is an important factor to ensure the quality of the whole project during construction.As vibration isolation measures are more and more commonly used in buildings,it is necessary to take effective measures for electrical equipment crossing vibration isolation trenches and layers to comply with the requirements of functional use and ensure project quality.In this study,several technical analyses on bus duct crossing vibration isolation trench are introduced,and specific technical analysis is carried out on the basis of relative specification requirements.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28