作 者:王林 Wang Lin
机构地区:[1]广东省水利水电第三工程局有限公司,广东东莞523710
出 处:《建筑技术开发》2023年第9期113-116,共4页Building Technology Development
摘 要:为解决某水电站项目交通桥T梁施工面临工期紧和施工场地十分有限的困难,项目部通过对交通桥T梁结构设计特点、施工工艺和施工预制场地情况的综合分析,制订了不同模板方案并进行比较分析,最终设计定制了一套组合式钢模板,制订了每条T梁的施工顺序,优化了施工工艺。结果表明:选定的模板方案保证T梁施工的质量,达到了预期的进度目标和成本目标,使项目其他部位的施工得以顺利开展。In order to solve the difficulties of tight construction period and very limited construction site in the construction of T-beam of access bridge in a hydropower station,through the comprehensive analysis of the structural design characteristics,construction technology and construction prefabrication site of T-beam of access bridge,the project department compared and analyzed different formwork schemes,and finally designed and customized a set of combined steel formwork,formulated the construction sequence of each T-beam,and optimized the construction technology.The results show that the selected formwork scheme ensures the quality of T-beam construction,achieves the expected schedule and cost objectives,enables the construction of other parts of the project to be carried out smoothly.
分 类 号:TU755.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117