检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李玲玲[1] 李严 Li Ling-ling;Li Yan
机构地区:[1]中南建筑设计院股份有限公司,武汉430070
出 处:《建筑技术开发》2023年第9期148-150,共3页Building Technology Development
摘 要:通过分析武汉某数据中心项目空调负荷情况,进行冷热源系统设计。通过冷热源方案对比,对比分析初投资及运行能耗,探讨如何选择适合的冷热源方案,达到整个项目综合能效的最佳利用效率;对比分析各种工况下的主机运行策略。By analyzing the air conditioning load of a data center project in Wuhan,the design of the cooling and heating source system was carried out.Through the comparison of cold and heat source schemes,the initial investment and operating energy consumption are compared and analyzed,and how to select the appropriate cold and heat source scheme is discussed to achieve the best utilization efficiency of the comprehensive energy efficiency of the whole project.Compare and analyze the host operation strategies under various working conditions.
分 类 号:TU831[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7