作 者:李聪 Li Cong
出 处:《建筑技术开发》2023年第9期151-154,共4页Building Technology Development
摘 要:长沙市某医院项目工程场地为渣土消纳场,均为深厚填土层,场地整平后将在场地四周形成高3~16 m的填方边坡。采用“放坡+格宾挡墙”边坡支护形式,有效解决短期内完成3~16 m的深厚填土层边坡治理难题。经过对边坡水平位移及沉降监测,在一个月以后逐步趋于稳定,水平位移及沉降的变形速率和变形累计值均未超过设计预警值。The site of an hospital project in Changsha is a waste disposal site,all of which are filled with deep soil layer.After the site is leveled,a filled slope with a height of 3~16 m will be formed around the site.The use of slope release+Gabion retaining wall form of slope support,effectively solve the short term to complete the 3~16 m deep fill soil slope management problem.After monitoring the horizontal displacement and settlement of the slope,it gradually tended to be stable after 1 month,and the deformation rate and cumulative value of the horizontal displacement and settlement did not exceed the design warning value.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.242.179