检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:夏小勇 刘浩磊 谢为良 程途[2] Xia Xiaoyong;Liu Haolei;Xie Weiliang;Cheng Tu(Dongguan Shenzhen Energy Zhangyang Power Co.,Ltd.,Guangdong Dongguan 523000,China;Jiangsu Huadian Qishuyan Power Generation Co.,Ltd.,Jiangsu Changzhou,213011 China)
机构地区:[1]东莞深能源樟洋电力有限公司,广东东莞523000 [2]江苏华电戚墅堰发电有限公司,江苏常州213011
出 处:《燃气轮机技术》2023年第3期69-72,共4页Gas Turbine Technology
基 金:国防科技创新特区基金资助项目(17-H-05-ZT-002-041-01)。
摘 要:本文主要针对安萨尔多燃气轮机AE94.3A配套汽轮机冷态启动时间长,不能适应电网调峰要求,在现有系统的基础上进行技术改造,从而大幅缩短冷态启动时间,满足电网要求,同时可大幅节约冷态启动中燃料的消耗,从而达到节能增效的目的,为燃气-蒸汽联合循环优化冷态启动提供了新的思路。This article is about preheating technique in cold start applying to turbine matched by the Ansaldo gas turbine AE94.3A,solving the problem of the long cold start time which can not meet the load regulation requirements of the power grid.Based on the existing system,this technical transformation was carried out,so as to significantly shorten the cold start time,meeting the requirements of the power grid,greatly saving the fuel consumption in cold start process and achieving the purpose of energy conservation and efficiency increasing,providing a new idea for the optimization of cold start of gas-steam combined cycle unit.
分 类 号:TK478[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.65.88