基于马尔可夫过程的漏电保护器服役状态及其可靠性分析  被引量:4

Service States and Reliability Analysis of Residual Current Device Based on Markov Process

在线阅读下载全文

作  者:李奎[1,2] 郝运佥 赵成晨 戴逸华 管瑞良 Li Kui;Hao Yunqian;Zhao Chengchen;Dai Yihua;Guan Ruiliang(State Key Laboratory of Reliability and Intelligence of Electrical Equipment Hebei University of Technology,Tianjin 300130 China;Key Laboratory of Electromagnetic Field and Electrical Apparatus Reliability of Hebei Province Hebei University of Technology,Tianjin 300130 China;Changshu Switchgear Manufacturer Co.Ltd,Changshu 215500 China)

机构地区:[1]省部共建电工装备可靠性与智能化国家重点实验室(河北工业大学),天津300130 [2]河北工业大学河北省电磁场与电器可靠性重点实验室,天津300130 [3]常熟开关制造有限公司,常熟215500

出  处:《电工技术学报》2023年第18期5061-5076,共16页Transactions of China Electrotechnical Society

基  金:国家自然科学基金(51937004,51777056);河北省自然科学重点基金(E2019202124)资助项目。

摘  要:漏电保护器在实际服役过程中可能会发生故障,但诱发其故障暴露的激励条件不具备时,其故障并不能显现出来。针对这一问题,提出一种计及隐藏故障的漏电保护器运行状态划分方法,建立基于马尔可夫过程的运行状态转移模型,实现漏电保护器的实际服役状态准确描述;设计基于蒙特卡洛法的漏电保护器可靠性仿真模型,以漏电故障频次、漏电流大小、保护器可靠性水平和运行时间为主要变量,对无检查和有检查下漏电保护器的状态概率进行仿真分析,确定了保证供电系统可靠性和安全性条件下的最低定期检查频次。该方法适用于不同可靠性水平的漏电保护器的分析与评估,对其定期检查策略的制定具有指导意义。The residual current Device(RCD)is mainly used to protect power supply lines or electrical equipment leakage faults.During the service of the RCD,it may occur to the reject-operation or the wrong-operation.If the RCD loses its leakage protection function,the lines or equipment have safety hazards,such as personal electric shock or leakage fire.Therefore,it is necessary to study the reliability of RCD.If the RCD fails,its fault state is exposed only when the corresponding excitation condition occurs.The higher the reliability level of RCD,the lower the reject-operation rate and wrong-operation rate.The higher the probability of a normal service state,the lower the probability of a fault state.The reliability block diagram is shown in Fig.A1.The fault state of RCD is divided into two categories:the hidden failure state and the appearing fault state.Therefore,there are five service conditions of RCD:normal service state(State 1),the hidden reject-operation state(State 2),the hidden wrong-operation state(State 3),the appearing reject-operation state(State 4),and the appearing wrong-operation state(State 5).The current moment states corresponding to State 4 and State 5 are necessarily State 2 and State 3,not State 1(previous state).The state at the next moment only relates to the current state,which satisfies the Markov property.Markov process can be used to describe the state transfer of RCD.There are safety hazards when RCD is in the hidden failure state,and it is necessary to eliminate the hidden fault state of RCD by periodic inspection.The state transition diagram of RCD based on periodic inspection is shown in Fig.A2.In general,if the frequency of fault leakage of power supply lines or electrical equipment is low,the RCD in the hidden reject-operation state can be found at a lower periodic inspection frequency.However,the normal leakage of power supply lines or electrical equipment exists permanently,so the probability of the wrong-operation appearance state is still high.If the RCD reliability level is low,self

关 键 词:漏电保护可靠性 激励响应法 马尔可夫过程 定期检查 服役可靠性 

分 类 号:TM56[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象