检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑清 张熙 申玉生 邱居涛 王耀达 陈孔福 ZHENG Qing;ZHANG Xi;SHEN Yu-sheng;QIU Ju-tao;WANG Yao-da;CHEN Kong-fu(Key Laboratory of Transportation Tunnel Engineering of Ministry of Education,Southwest Jiaotong University,Chengdu 610031,China;National Engineering Laboratory for Technology of Geological Disaster Prevention in Land and Transportation,Southwest Jiaotong University,Chengdu 610031,China)
机构地区:[1]Key Laboratory of Transportation Tunnel Engineering of Ministry of Education,Southwest Jiaotong University,Chengdu 610031,China [2]National Engineering Laboratory for Technology of Geological Disaster Prevention in Land and Transportation,Southwest Jiaotong University,Chengdu 610031,China
出 处:《Journal of Central South University》2023年第7期2392-2410,共19页中南大学学报(英文版)
基 金:Project(51778540)supported by the National Natural Science Foundation of China;Project(2019YFC0605104)supported by the National Key R&D Program of China。
摘 要:随着穿越活断层隧道工程建设的飞速发展,跨断层隧道的分析和设计方法迫切需要相应的理论指导。本研究通过振动台模型试验和数值模拟,探讨了断层位错和地面运动对不同长度管片衬砌结构的影响规律和破坏机制。结果表明,随着衬砌纵向连接刚度(节理和节段衬砌)的减小,上盘与断裂带之间的结构相对位移减小,而下盘与断裂带之间的结构相对位移变化趋势相反。因此,应根据工程要求将靠近上盘的衬砌段划分为较小的段,而靠近下盘的衬砌段应划分为较大的段。结合试验结果提出了断层附近影响带的设防范围。在划分分段长度时还应考虑衬砌接缝的作用,以便在断层位错的影响下实现纵线的平滑过渡。本文数值模拟的破坏演化过程与振动台试验结果吻合较好。With the rapid development and construction of tunnel engineering across active faults,the analysis and design methods for crossing-fault tunnels urgently need appropriate theoretical guidance.Under the action of fault dislocation and ground motion,the influence law and failure mechanism of segmental lining structures with different lengths were explored via shaking table model test and numerical simulation.The results show that the structural relative displacement between the hanging wall and the fracture zone is reduced,accompanying by the decrease of lining longitudinal connection stiffness,while the variation tendency of structural relative displacement between the footwall and the fracture zone is to the contrary.Therefore,the lining segments near the hanging wall should be divided into smaller segments,and the lining segments near the footwall should be larger according to engineering requirements.Combined with the test results,the fortification range of the affected zone near fault is proposed.The function of lining joints should also be considered when dividing the length of segments,so that the smooth transition of longitudinal lines under the affection of fault dislocation can be realized.It is found that the failure evolution process of numerical simulation is well coincided with the result of shaking table test.
关 键 词:穿越断层隧道 节段衬砌 相对位移 振动台模型试验 数值模拟
分 类 号:U451.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.136.226