作 者:崔梓祺 陈家立 CUI Ziqi;CHEN Jiali(Guangdong NO.3 Water Conservancy and Hydro-Electric Engineering Board Co.,Ltd.Dongguan 523710,China)
机构地区:[1]广东省水利水电第三工程局有限公司,广东东莞523710
出 处:《广东土木与建筑》2023年第9期83-86,共4页Guangdong Architecture Civil Engineering
摘 要:为了探索大直径大坡度输水钢管在弱风化岩层的顶管顶进施工技术,以某输水工程为研究对象,采用动静结合的方法控制DN 2000 mm×20 mm大直径压力钢管以8.455%大坡度定向精准顶进,同时采用供水反沙法和高浓度膨润土砂浆减少摩擦阻力,能提高弱风化岩层顶管顶进施工效率,节省施工成本,缩短工期。In order to explore the construction technology of the pipe jacking construction of large diameter and large slope steel pipe of water conveyance in the weak weathered rock layer,toke a water transmission project as the research object,the dynamic and static combi-nation method was used to control the DN 2000 mm×20 mm large diameter penstock with 8.455%slope orientation and large slope preci-sion.At the same time,the anti-sediment water supply method and high plasticity bentonite cement grouting were used to reduce friction,so that we can improve the construction efficiency of the pipe jacking of water conveyance in the weak weathered rock layer,save construction costs and shorten time limit for a project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7