两阶段重调度策略求解柔性作业车间动态调度问题  

Two-stage Rescheduling Strategy for Flexible Job Shop Dynamic Scheduling Problem

在线阅读下载全文

作  者:谭殷飞 赵新 黎兴宝 马立[1] 

机构地区:[1]上海大学机电工程与自动化学院,上海200072 [2]江苏亚威机床股份有限公司,江苏扬州225200

出  处:《工业控制计算机》2023年第9期126-128,共3页Industrial Control Computer

摘  要:区别于传统作业车间调度问题,研究一种工件之间具有优先约束的柔性作业车间问题。首先建立多目标静态调度模型,利用JAYA方法进行求解,通过实验得到变异因子的最佳值。其次,提出一种新的两阶段的动态调度策略,在静态调度结果上进行调整,同时对短期和长期恢复的扰动问题重调度。实验证明,提出的动态调度方法能同时有效减少完工时间和机器偏移情况。Different from traditional job shop scheduling problem,this paper studies a flexible job shop problem with job preference constraint.Firstly,a multi-objective static scheduling model is established and solved by JAYA method.The optimal values of variation factors are obtained through experiments.Secondly,this paper proposes a new two-stage dynamic scheduling strategy to adjust the static scheduling and reschedule both short and long recoveries.Experimental results show that the rescheduling method is effective in reducing final time and machine offset.

关 键 词:工件优先约束 柔性作业车间 多目标问题 动态调度 

分 类 号:TH165[机械工程—机械制造及自动化] TP18[自动化与计算机技术—控制理论与控制工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象