检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王新军 左玉云 Wang Xinjun and Zuo Yuyun(Shanghai Baoye Group Co.,Ltd.,Shanghai 201900;,2.Sports and Sports Engineering Management Center of Shenzhen Construction and Public Works Department,Shenzhen,Guangdong 518000)
机构地区:[1]上海宝冶集团有限公司,上海201900 [2]深圳市建筑工务署文体工程管理中心,广东深圳518000
出 处:《现代物业(中旬刊)》2023年第9期178-180,共3页Modern Property Management
摘 要:大型基坑土方开挖难度较大,主要体现在工程量大、场地环境差、流沙、流土可能性高等方面。本文以武汉某一工程实例为参照,尝试通过分区开挖、调整开挖顺序、分阶段开挖等多种方式优化土方开挖流程。从工程结果表现上,该操作已达到预期效果,希望相关施工经验能够对同类型作业有一定的参考作用。It is difficult to excavate large foundation pit earthwork,which is mainly reflected in the large amount of engineering,poor site environment,and high possibility of quicksand and flowing soil.Taking an example of a project in Wuhan as a reference,this paper tries to optimize the earthwork excavation process by zoning the excavation,adjusting the excavation sequence and excavation by stages.From the performance of the engineering results,the operation has achieved the expected effect,I hope that the relevant construction experience can have a certain reference role for the same type of operation.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.150.165