检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李新旺 郝云德[1] 程立朝 路滨 Li Xinwang;Hao Yunde;Cheng Lichao;Lu Bing(School of Mining Geomatics Engineering,Hebei University of Engineering,Handan 056038,China;Coal Resources Development and Construcyion Application Technology Research Center of Universities in Hebei Province,Hebei University of Engineering,Handan 056038,China;Handan Coal-based Solid Waste Scale Utilization Technology Innovation Center,Hebei University of Engineering,Handan 056038,China)
机构地区:[1]河北工程大学矿业与测绘工程学院,河北邯郸056038 [2]河北工程大学河北省高校煤炭资源开发与建设应用技术研发中心,河北邯郸056038 [3]河北工程大学邯郸市煤基固废规模化利用技术创新中心,河北邯郸056038
出 处:《煤炭与化工》2023年第8期38-43,共6页Coal and Chemical Industry
基 金:河北省自然科学基金(E2022402014);河北省自然科学基金(E2020402041);河北省高等学校科学技术研究项目(ZD2022074)。
摘 要:以九龙矿为背景,利用微震监测技术对该矿15249S工作面进行长期动态实时监测,针对底板微震事件频次、累积能量与推进距离、破坏深度进行相关度分析,揭示了底板破坏带的空间分布特征,确定了底板破坏深度及破坏范围。结果表明,微震事件以近煤层弱事件为主,底板事件个数大于顶板事件,上顺槽底板事件个数大于下顺槽底板事件;受开采扰动影响,15249S工作面底板破坏程度逐渐加深,最终形成2个破坏带,在走向上呈“倒双峰”式分布;底板破坏深度总体上与微震事件频次及微震事件累计能量成正相关,底板最大破坏深度为25 m,无突水危险。研究结果为九龙矿现场安全生产提供支撑,并对类似大埋深缓倾斜煤层开采提供参考。Based on the background of Jiulong Mine,the long-term dynamic real-time monitoring of the No.15249S Face of the mine was carried out by using the microseismic monitoring technology.The correlation analysis of floor microseismic events frequency,cumulative energy,advancing distance and failure depth was carried out.The spatial distribution characteristics of the floor failure zone were revealed,and the failure depth and failure range of the floor were determined.The results showed that the microseismic events were mainly weak and near coal seam,the number of floor events was greater than that of roof events,and the number of floor events of upper roadway was greater than that of lower roadway.Affected by mining disturbance,the damage degree of the floor of No.15249S Face gradually deepened,and finally two failure zones were formed,which were distributed in the influence of'inverted double peak'along the strike.The failure depth of floor was generally positively correlated with frequency and cumulative energy of microseismic events.The maximum failure depth of the floor was 25 m,and there was no risk of water outburst.The research results provided support for the on-site safety production of Jiulong Mine and provided reference for the mining of similar large buried depth and gently inclined coal seams.
关 键 词:微震监测 底板破坏 大埋深 缓倾斜厚煤层 煤层合并
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.16