检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖骞 王博 刘卫卫 Xiao Qian;Wang Bo;Liu Weiwei(China Coal Technology and Engineering Xi’an Research Institute(Group)Co.,Ltd.,Xi’an 710077,China)
机构地区:[1]中煤科工西安研究院(集团)有限公司,陕西西安710077
出 处:《煤炭与化工》2023年第8期71-75,共5页Coal and Chemical Industry
摘 要:针对唐家会矿井下存在的DF201导水断层影响61202工作面回风顺槽安全掘进的问题,为查明断层导水情况,消除突水威胁,合理布置该工作面,采用定向钻进技术对DF201断层进行探查治理,累计施工底板定向钻孔11个,总进尺2544 m,证实该断层导通底板奥灰水。通过钻孔注浆工艺封堵导水断层及裂隙,累计注入水泥431.85 t,断层附近的总出水量减小为约10 m^(3)/h,有效降低了断层突水风险,为巷道安全掘进提供了有利保障。Aiming at the problem that the DF201 water conducting fault in Tangjiahui Mine affected the safe excavation of the return air roadway of No.61202 Face,in order to find out the water conducting condition of the fault,eliminate the threat of water outburst,and reasonably arrange the working face,the directional drilling technology was used to explore and control the DF201 fault.A total of 11 directional drilling holes were drilled in the floor,with a total footage of 2544 m,which confirmed that the fault conducted the Ordovician limestone water in the floor.Through the drilling grouting process,the water conducting faults and cracks were sealed,and 431.85 t of cement was injected cumulatively.The total water outflow near the fault was reduced to about 10 m^(3)/h,which effectively reduced the risk of water outburst from the fault and provided a favorable guarantee for the safe excavation of the roadway.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.248.235