检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董青 邹政达 李炳华 徐学民 Dong Qing;Zou Zhengda;Li Binghua;Xu Xuemin(CCDI Group(Beijing),Beijing 100013,China)
机构地区:[1]悉地(北京)国际建筑设计顾问有限公司,北京100013
出 处:《智能建筑电气技术》2023年第5期24-28,共5页Electrical Technology of Intelligent Buildings
摘 要:本文简要介绍了中国人寿研发中心一期环保科技园项目的电气系统概况,并重点讲述数据中心RR供配电系统和LEED铂金奖设计,以期读者对本项目电气设计特点有较全面的了解。项目中包含我国第一个获得T4级认证的地下数据中心机房和获得LEED绿色建筑认证铂金奖的研发中心。数据中心设置2组(12+1)10kV柴油发电机组、每组均采用双母线输出、确保电源供电可靠性,变电所及UPS采用RR系统、结合IT机房模组模块化配置、多模组共享一组备份,提高系统效率。研发中心设置135kWp光伏发电系统,在变电所0.4kV低压配电柜处并网,自发自用,降低传统能源消耗。The article briefly introduces the electrical system overview of the China Life Research and Development Center Phase I Environmental Protection Technology Park project,with a focus on the RR power supply and distribution system of the data center and the design of the LEED Platinum Award,in order to provide readers with a comprehensive understanding of the electrical design characteristics of this project.The project includes the first underground data center in China obtaining T4 cerification and the Research&Development center receiving the LEED Platinum Award for Green Building Certification.The data center has two groups of(12+1)10kV diesel generator sets,each group adopts dual bus output to ensure the reliability of power supply.The substation and UPS system for IT load are designed as RR system based on the modular configuration of IT server rooms,and multiple modules share a group of backups to improve the system efficiency.The Research&Development center is provided with a 135kWp photovoltaic power generation system,which is connected to the grid at the O.4kv low-voltage switchgear in the substation,and can be used spontaneously to reduce traditional energy consumption.
关 键 词:数据中心 LEED T4 RR供配电系统 太阳能光伏并网发电系统
分 类 号:TU244[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48