检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹德政 程港[1] 钱志博 Cao Dezheng;Cheng Gang;Qian Zhibo(Sinomach Tdi International Engineering Co.,Ltd.,Beijing 100083,China)
出 处:《智能建筑电气技术》2023年第5期102-104,共3页Electrical Technology of Intelligent Buildings
摘 要:本文采用《光伏发电站设计规范》GB 50797—2012中的计算方法,确定光伏组件不同安装倾角下方阵间距,并利用PVsyst软件建模,对光伏系统进行仿真,得出光伏组件在不同安装倾角下光伏系统发电量;由《光伏发电系统效能规范》NB/T 10394—2020中的方法计算出项目的平准化度电成本(LCOE),LCOE最小,则对应光伏组件的安装倾角最适合该项目。In this paper,the calculation method in“Code for design of photovoltaic power station”GB 50797-2012 is adopted to determine the square spacing of photovoltaic modules under different installation angles,and PVsyst software is used to model and simulate the photovoltaic system,and the photovoltaic system energy generation under different installation angles is obtained.The normalization kilowatt-hour cost(LCOE)of the project is calculated by the method in the“Specification for Photovoltaic Power Generation System Performance”NB/T 10394-2020.If the LCOE is the smallest,the installation Angle of the corresponding photovoltaic module is the most suitable for the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7