银星一号井十八_(上1)煤采空后十三煤上行开采可行性研究  

Feasibility Study on Ascending Mining of 13 Coal Seam after 18_(上1)Coal Seam was Mined empty in Yinxing No.1 Mine

在线阅读下载全文

作  者:张虎 温阳 魏鑫 ZHANG Hu;WEN Yang;WEI Xin(Ningxia Yinxing Coal Industry Co.,Ltd.;School of Mining Engineering,Taiyuan University of Technology)

机构地区:[1]宁夏银星煤业有限公司 [2]太原理工大学矿业工程学院

出  处:《现代矿业》2023年第9期99-101,105,共4页Modern Mining

摘  要:为确定银星一号井18_(上1)煤开采后13煤上行开采的可行性,选取18_(上1)煤11采区1118_(上1)04工作面为测试地点,综合运用比值法、“三带”判别法及围岩平衡法进行对比分析。比值法计算得到采动影响倍数K=27.95;理论计算“两带”最大高度为46.33 m;围岩平衡法分析得出上行开采的最小高度为27.41 m,均小于层间距92.23 m。通过现场打钻探测18_(上1)煤开采后,裂缝带发育高度为51.16 m,探测结果与理论分析相吻合,证明了13煤上行开采可行。In order to determine the feasibility of upward mining of 13 coal seam after 18_(上1)coal seam mining in Yinxing No.1 mine,1118_(上1)04 working face in 11th mining area of 18_(上1)coal seam was selected as the test site,and the comparative analysis is carried out by using ration method,“three zones”discriminant method and surrounding rock balance method.The ratio method obtained the mining influence multiple K=27.95.The maximum height of the“two zones”is 46.33 m.The analysis of surrounding rock balance method shows that the minimum height of upward mining is 27.41 m,which is smaller than the interval of 92.23 m.The fracture zone development height is 51.16 m after coal seam mining in 18_(上1)through field drilling.The detection results are consistent with theoretical analysis,which proves that upward mining of 13 coal seam is feasible.

关 键 词:上行开采 比值判别法 “两带”高度 围岩平衡法 

分 类 号:TD325.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象