检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范国良 蒋祖华 Guoliang Fan;Zuhua Jiang(School of Mechanical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China)
机构地区:[1]School of Mechanical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China
出 处:《哈尔滨工程大学学报(英文版)》2023年第3期624-635,共12页Journal of Marine Science and Application
基 金:Supported by the China High-Tech Ship Project of the Ministry of Industry and Information Technology under Grant No.[2019]360.
摘 要:Intermediate charging and sudden failure of automatic guided vehicles(AGVs)interrupt and severely affect the stability and efficiency of scheduling.Therefore,an AGV scheduling approach considering equipment failure and power management is proposed for outfitting warehouses.First,a power consumption model is established for AGVs performing transportation tasks.The powers for departure and task consumption are used to calculate the AGV charging and return times.Second,an optimization model for AGV scheduling is established to minimize the total transportation time.Different conditions are defined for the overhaul and minor repair of AGVs,and a scheduling strategy for responding to sudden failure is proposed.Finally,an algorithm is developed to solve the optimization model for a case study.The method can be used to plan the charging time and perform rescheduling under sudden failure to improve the robustness and dynamic response capability of AGVs.
关 键 词:Automatic guided vehicle SCHEDULING Outfitting warehouse Power consumption Equipment failure
分 类 号:U673.38[交通运输工程—船舶及航道工程] U671.91[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.136.160