松散破碎全煤准备巷道围岩控制技术研究  被引量:1

Research on Surrounding Rock Control Technology for Loose and Broken Full Coal Preparation Roadway

在线阅读下载全文

作  者:孟超 Meng Chao(Huozhou Coal Electricity Group Co.,Ltd.Liyazhuang Coal Mine,Shanxi Huozhou 031412)

机构地区:[1]霍州煤电集团有限责任公司李雅庄煤矿,山西霍州031412

出  处:《山东煤炭科技》2023年第9期7-10,共4页Shandong Coal Science and Technology

摘  要:为解决腾晖煤业三采区回风巷掘巷阶段围岩变形破坏的问题,综合运用理论分析、数值模拟、现场观测等方法,优化巷道支护方案,工程应用阶段进行矿压监测验证方案的有效性。研究表明:巷道原锚网喷支护强度不足,顶板应采用锚网索喷联合支护,底板应采用反底拱锚注联合支护,巷道变形量减小50%以上,设计方案在腾晖煤业得到了成功应用。In order to solve the problem of surrounding rock deformation and failure during the excavation stage of the return air roadway in the third mining area of Tenghui Coal Industry,theoretical analysis,numerical simulation,on-site observation and other methods are comprehensively used to optimize the roadway support scheme.The effectiveness of the mine pressure monitoring verification scheme is carried out during the engineering application stage.The research showed that the strength of the original anchor mesh spray support in the roadway is insufficient,the roof should be supported by a combination of anchor mesh cable spray,and the bottom plate should be supported by a combination of inverted bottom arch anchor injection.The deformation amount of the roadway is reduced by more than 50%,and the design scheme is successfully applied in Tenghui Coal Industry.

关 键 词:半圆拱 煤巷 支护 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象