检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王其军 WANG Qijun
机构地区:[1]国电投河南工程运维有限公司,河南郑州450016
出 处:《电力系统装备》2023年第9期134-136,共3页Electric Power System Equipment
摘 要:某火电厂600MW机组汽轮机1号轴承运行中振动超过报警值,分析确认引起轴承振动的主要原因为瓦枕定位销孔与轴承相对位置安装错误。此缺陷较为隐蔽,不易发现,检修中重新加工轴瓦定位销孔,纠正安装方法,彻底解决了1号轴承振动大的问题,为同类机组检修提供了良好的经验借鉴。The vibration of the No.1 bearing of a 600 MW steam turbine in a thermal power plant exceeded the alarm value during operation.Analysis confirmed that the main cause of bearing vibration was the installation error of the positioning pin hole of the bearing pillow relative to the bearing.This defect is relatively hidden and difficult to detect.During maintenance,the positioning pin hole of the bearing pad was reprocessed,the installation method was corrected,and the problem of high vibration of the No.1 bearing was completely solved,providing a good experience for similar units to learn from.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.240.141