检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李晓伟 LI Xiaowei(CSGES Operation Management Company,Guangzhou 511400,China)
机构地区:[1]南方电网调峰调频发电有限公司运行分公司,广东广州511400
出 处:《中国水能及电气化》2023年第9期11-16,34,共7页China Water Power & Electrification
摘 要:抽水蓄能电站水库运行特性明显,水库水位变化频繁、变幅大,给电站水库岸边坡塌方综合治理带来了较大困难。文章以广州抽水蓄能电站实际工程应用为例,研究并实施了一种“混凝土挡土墙+泡沫轻质土+浆砌石护边坡+石笼护坡脚”的抽水蓄能电站水库库岸边坡塌方综合治理方案,取得了良好的治理效果及综合效益,可为后续类似工程的方案设计及实施提供借鉴。The operational characteristics of the pumped storage power station reservoir are evident,with frequent and large fluctuations in water level,posing significant challenges for the comprehensive treatment of slope collapses along the reservoir banks.Taking the practical application of pumped storage power station in Guangzhou as an example,this paper studies and implements a comprehensive treatment scheme for slope collapses along the reservoir banks,which includes a combination of concrete retaining walls,lightweight foam soil,mortar stone protection for slope edges,and gabion protection for slope toes.The scheme has achieved favorable treatment results and comprehensive benefits,providing valuable references for the design and implementation of similar projects in the future.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.90.123