On the Danger of Threats Underestimating and the Resulting Unreliable Assessment of Building Fire Safety  

在线阅读下载全文

作  者:PawełA.Król 

机构地区:[1]Faculty of Civil Engineering,Institute of Building Engineering,Warsaw University of Technology,00-637 Warsaw,Poland

出  处:《Journal of Civil Engineering and Architecture》2023年第8期395-405,共11页土木工程与建筑(英文版)

摘  要:The paper gives an example showing that the utilization of prescriptive rules in some situations can lead to strong underestimation of the real risks and inadequate fire safety assessment of buildings.The issue seems to be very important as the prescriptive rules in many European countries are the only allowed and acceptable by the authority’s method of building fire safety assessment.The building presented in this paper is an exemplary bakery plant consisting of several premises of a different purpose and method of use,e.g.:technical facilities,production depot,distribution and storage spaces,long-term storage cool rooms,etc.The whole building that consists of single-story technological(production and storage)part and(located on two stories)office parts was approved as a singular fire zone with a total usable area of 6280 m2.The technological area includes production facilities,storage depots of raw materials,packages and finished products,as well as cold stores and a number of auxiliary function rooms.In the second(having two stories)part of the building some social rooms,administrative areas and offices are localized.The total height of the building(at the highest point)does not exceed 10.5 m.Due to the Polish regulations the parameters determining the fire-related requirements of individual structural elements of the building(especially in terms of their fire resistance)are the surface area,the average value of the fire-load density and the presence of the risk of possible explosion.The building was designed based on the assumption that the average fire-load density does not exceed the level of 1000 MJ/m2.The analysis and calculations carried out during the exploitation phase of the building confirmed the compatibility with the assumptions adopted,but the actual volume,estimated at the level of 974 MJ/m2 proved to be very close to the limit value.Exceeding of the limit value of 1000 MJ/m2-due to provisions given in a state regulations-would automatically double the formal requirements for the resistance of

关 键 词:Fire safety assessment fire resistance prescriptive rules case study 

分 类 号:O17[理学—数学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象