检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑志翔 ZHENG Zhixiang(Fuzhou urban and rural construction general group Co.,Ltd.,Fuzhou 350007)
机构地区:[1]福州市城乡建总集团有限公司,福建福州350007
出 处:《福建建筑》2023年第8期54-57,63,共5页Fujian Architecture & Construction
摘 要:通过结合工程实际案例,研究主楼钢结构柱脚连接位置设置于负一层楼板处,存在模板加固、钢柱安装、混凝土浇筑质量、成本造价等问题。通过深度剖析具体施工细节及控制要点,探讨采用首层钢结构柱外包式柱脚和精准定位预埋锚杆螺栓的方式将上部钢结构柱与地下室顶板混凝土进行连接,可以降低施工难度,提前工期和节约造价。This paper studies the problems of template reinforcement,steel column installation,concrete pouring quality,and cost in setting the connection position of themain building's steel structure column base at the negative first floor level through the combination of practical engineering cases.By deeply analyzing specific construction details and control points,this paper explores the use of external column bases for the first-floor steel structure columns and accurately positioned embedded anchor bolt screws to connect the upper steel structure columns with the basement roof concrete.This method can reduce construction difficulty,shorten construction period,and save costs.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49