检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:栗文明 曹蕾 徐纬 李军 唐敏 周君薇 LI Wenming;CAO Lei;XU Wei;LI Jun;TANG Min;ZHOU Junwei(Jiangsu Provincial Environmental Engineering Technology Co.,Ltd.,Nanjing 210036,China;Jiangsu Province Engineering Research Center of Standardized Construction and Intelligent Management of Industrial Parks,Nanjing 210036,China;Jiangsu Environmental Protection Group Co.,Ltd.,Nanjing 210036,China)
机构地区:[1]江苏省环境工程技术有限公司,江苏南京210036 [2]江苏省工业园区规范化建设及智慧化管控工程研究中心,江苏南京210036 [3]江苏省重点行业减污降碳协同控制工程研究中心,江苏南京210036 [4]江苏省环保集团有限公司,江苏南京210036
出 处:《水处理技术》2023年第9期152-156,共5页Technology of Water Treatment
基 金:江苏省环保集团科技项目计划:基于不同处理要求与回用标准的工业废水深度处理成套工艺装备研究与示范(JSEP-TZ-2021-1001-RE)。
摘 要:江苏某化工园区污水厂主要收集园区精细化工、医药、农药、染料中间体和生物化工制品等企业的工业废水,提标改造工程设计规模为2.0万m^(3)/d,出水执行《城镇污水处理厂污染物排放标准》(GB 18918-2002)一级A标准。通过测定微生物OUR呼吸速率对进水进行分析,实现进水毒性废水单独收集并进行臭氧高级氧化预处理,可提高生化系统的运行稳定性。生化系统采用MBR工艺,并根据来水特点设计为多模式运行,深度处理采用活性炭吸附工艺,可有效降低出水污染物浓度,保证出水达标。工程吨水投资2 950元/m^(3),新增水处理成本为4.03元/m^(3)。The wastewater treatment plant of a chemical industrial park in Jiangsu province mainly collects industrial wastewater from enterprises of the fine chemical industry,medicine,pesticide,dye intermediates and bio-chemical products in the park.The capacity of the upgrading project is 20000 m^(3)/d,and the effluent meets the First-class A standard of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB18918-2002).The toxic wastewater from the influent can be collected separately according to the Oxygen Uptake Rate and treated by combing the advanced Ozone oxidation pretreatment,which can improve the operation stability of the biochemical system.The biochemical system adopts the MBR process,which was designed to operate in multiple modes according to the characteristics of the influent.The advanced treatment adopts an activated carbon adsorption process,which can effectively reduce the effluent pollutant concentration and ensure the effluent reaches the standard.The investment of the project is 2950 yuan/m^(3),the cost is increased by 4.03 yuan/m^(3).
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.212.110