检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范祺 FAN Qi(Taiyuan Detachment of Shanxi Expressway Comprehensive Administrative Law Enforcement Corps,Taiyuan,Shanxi 030006,China)
机构地区:[1]山西省高速公路综合行政执法总队太原支队,山西太原030006
出 处:《山西交通科技》2023年第4期88-91,共4页Shanxi Science & Technology of Transportation
摘 要:为分析渣土荷载对运营西寨铁路隧道稳定性的影响,评价衬砌结构的安全性,选取最不利工况,按1∶1建立三维有限元计算模型,分析了渣土荷载作用下西寨隧道衬砌结构的应力和变形。分析结果表明,衬砌结构沿纵向呈受弯状态,顶部受压、底部受拉,最大压应力2.05 MPa,位于拱顶,整体拉应力小于1 MPa,拱顶沉降量最大为5.29 mm,洞门向外最大倾斜量小于1 mm,衬砌结构拉压强度和稳定性满足要求。To analyze the influence of the muck load on the stability of the operational Xizhai Railway Tunnel and evaluate the safety of the lining structure,this paper established the three⁃dimensional finite element calculation model of the most unfavorable working condition at 1∶1 to analyze the stress and deformation of the lining structure of the Xizhai Tunnel under the muck load.The results showed that the lining structure was flexural along the longitudinal direction,with the top compressed and the bottom strained,and the maximum compressive stress was 2.05 MPa,which was at the arch crown.The overall tensile stress was less than 1 MPa,the maximum settlement of the arch crown was 5.29 mm,and the maximum outward inclination of the tunnel door was less than 1 mm.The tensile strength,compressive strength,and stability of the lining structure satisfied the requirements.
关 键 词:渣土荷载 铁路隧道 数值分析 结构响应 安全性评价
分 类 号:U452.11[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.103.40