检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陶叶峰 TAO Yefeng
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092 [2]上海城市交通设计院有限公司,上海200025
出 处:《上海公路》2023年第3期171-175,182,M0008,共7页Shanghai Highways
摘 要:陈海公路是崇明岛东西向的最长公路,也是全区交通最繁忙的道路。其现状沿线除平面开口外,更有多处行人踩踏过街的通道,给交通管理带来了严峻挑战。在分析现状过街形式及需求的基础上,对现状路段的过街设施进行梳理,并综合考虑立体过街需要、工程影响、交通参与者需求,以及工程造价等方面,开展多方案设计与比选,提出合理的过街方案。该人行过街设施方案的研究,对干线公路过街设施的设置具有一定的借鉴作用。Chenhai Highway,as the longest highway from east to west in Chongming Island,is also the busiest road in the whole region.In addition to the plane opening,there are more and more pedestrians stampede across the street corridor along the current situation,which brings serious challenges to traffic management.Based on the analysis of the present street crossing form and demand,this paper combs the crossing facilities of the current road section,comprehensively considers the needs of three-dimensional crossing,the influence of the project,the needs of traffic participants and the cost of the project,and carries out multi-scheme design and selection,and puts forward a reasonable crossing scheme.The research on the scheme of crossing facilities can be used as a reference for the establishment of crossing facilities on trunk roads.
分 类 号:U491.226[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.161.16