检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱涛 赵兴成 ZHU Tao;ZHAO Xingcheng(Shanghai Hydraulic Engineering Group Co.,Ltd,Shanghai 201612,China;Anhui Provincial Group Limited for Yangtze-to-Huaihe Water Diversion,Hefei 230022,China)
机构地区:[1]上海市水利工程集团有限公司,上海201612 [2]安徽省引江济淮集团有限公司,安徽合肥230022
出 处:《安徽水利水电职业技术学院学报》2023年第3期16-20,共5页Journal of Anhui Technical College of Water Resources and Hydroelectric Power
摘 要:针对引江济淮工程朱集泵站大尺寸肘形流道施工技术要求高、模板加工难度大、模板易发生变形、模板加工周期长等问题,采用在普通装配式钢模的基础上进行全断面整体制作、分拆安装的方法,解决了大型泵站肘形流道线形、模板体系稳定性及外观质量难控制的难题。In response to the problems of high technical requirements for large-scale elbow-shaped flow channel construction,great difficulty in formwork processing,easy deformation of formwork and long formwork processing period in Zhuji pumping station of Yangtze-to-Huaihe water diversien project,the method of full-section overall production and split installation based on common assembled steel formwork is adopted,which solves the problems of difficult control of elbow-shaped flow channel a-lignment,stability of formwork system and appearance quality in large pumping stations.
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.2