检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦子强 QIN Ziqiang(Geological Survey Department of Majiliang Mine,Jinneng Holding Coal Industry Group,Datong,Shanxi 037027,China)
机构地区:[1]晋能控股煤业集团马脊梁矿地质测量科,山西大同037027
出 处:《自动化应用》2023年第18期154-156,共3页Automation Application
摘 要:针对某煤矿工作面受水害影响,本文通过理论分析、井下实测施工、效果验证治理奥灰水突水,采用通道注浆和盖帽注浆的手段防水,并评价防水效果。结果表明,防隔水煤柱的宽度为44.15 m,在回采层底板的作用下,帽体与通道中的水泥填料结合在一起,水位从最初的182.14 m3/h降低到了32.43 m3/h。In view of the impact of water damage on a coal mine working face,this paper through theoretical analysis,underground field measurement construction and effect verification,the control of Ordovician limestone water inrush was carried out.Channel grouting and cap grouting were used to waterproof,and the waterproof effect was evaluated.The results show that:The width of the water-proof coal pillar is 44.15 m.Under the action of the stope floor,the cap body is combined with the cement filler in the passage,and the water level is reduced from the initial 182.14 m3/h to 32.43 m3/h.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94