深圳地铁8号线建设施工安全管理对策  

Safety Management Countermeasures for the Construction of Shenzhen Metro Line 8

在线阅读下载全文

作  者:张世豪 谢小山[1] 随灿[1] ZHANG Shihao;XIE Xiaoshan;SUI Can(Zhengzhou Railway Vocational and Technical College,Zhengzhou 451460,China)

机构地区:[1]郑州铁路职业技术学院,河南郑州451460

出  处:《郑州铁路职业技术学院学报》2023年第2期18-20,共3页Journal of Zhengzhou Railway Vocational and Technical College

基  金:郑州铁路职业技术学院科研项目(2022KY016)。

摘  要:为降低深圳地铁8号线二期、三期工程和深圳市其他地铁新建项目各类安全事故发生概率,提前发现并解决安全隐患,提高地铁现场施工安全管理水平,归纳分析深圳地铁8号线一期工程建设困难与挑战,分析并总结深圳地铁8号线一期工程施工过程中采取的安全管理措施。In order to reduce the probability of various safety accidents in the second and third phases of Shenzhen Metro Line 8 and other new subway projects in Shenzhen,identify and solve safety hazards in advance,improve the safety management level of subway on-site construction,summarize and analyze the current status of subway development and construction,explore the subjective and objective reasons for safety accidents,this paper analyzes the corresponding safety measures taken in the early and middle stages of Shenzhen Metro Line 8 construction.

关 键 词:深圳地铁8号线 安全管理 隐患排查 事故预防 

分 类 号:U231[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象