检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李智祥 Li Zhixiang(Huozhou Coal&Electricity Group Hejin Xuehugou Coal Industry Limited Liability Company,Hejin Shanxi 043300,China)
机构地区:[1]霍州煤电集团河津薛虎沟煤业有限责任公司,山西河津043300
出 处:《机械管理开发》2023年第9期143-145,共3页Mechanical Management and Development
摘 要:以山西某矿12062下巷围岩为研究对象,针对小煤柱孤岛工作面回采巷道受采动影响显著、围岩应力集中、裂隙发育、煤柱承载能力差等因素影响,巷道围岩变形量较大问题,提出采用锚索补强(充分发挥锚索主动支护效果)、架棚(单体+π型钢、一梁三柱)进行支护,并具体给出支护方案。经现场应用后,12062下巷顶底板、巷帮变形量最大为378 mm、460 mm,围岩变形量可满足12062综采工作面回采需要,现场取得较为显著的围岩控制效果。Taking the 12062 lower lane perimeter rock support as the background,for the small coal pillar island working face back to mining roadway by mining influence is significant,the surrounding rock stress concentration,fissure development,coal pillar bearing capacity is poor and other factors,the roadway perimeter rock deformation is larger,put forward to use the anchor cable reinforcing(give full play to the effect of the anchor cable active support),racking shed(monolithic+π-beam,a beam and three columns)support,and specifically give the support scheme.The support programme is given specifically.After the field application,the maximum deformation of top and bottom plate of 12062 lower lane and lane gang is 378 mm and 460 mm,and the deformation of surrounding rock can meet the needs of 12062 comprehensive mining face,and the field has achieved a more significant effect of controlling surrounding rock.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90