检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王晓斌 Wang Xiaobin(Jinneng Holding Coal Group Zhangshigou Coal Co.,Ltd.,Jincheng Shanxi 048400,China)
机构地区:[1]晋能控股煤业集团掌石沟煤业有限公司,山西晋城048400
出 处:《机械管理开发》2023年第9期258-259,共2页Mechanical Management and Development
摘 要:基于掌石沟煤矿15102工作面回采期间,工作面中部出现冒漏现象,导致工作面支架移架困难,工作面回采速度慢且回采安全系数低等问题,根据实际生产情况,对冒漏区施工人工假顶支护。通过实际应用效果来看,冒漏区施工人工假顶后控制了冒漏区范围扩大,防止了冒漏区瓦斯积聚现象,保证了支架在冒漏区范围内工作阻力及初撑力,取得了显著应用成效。Based on the problems that during the mining of 15102 working face in Zhaoshigou coal mine,there is a leakage phenomenon in the middle of the working face,which leads to the difficulty of moving the working face bracket,slow mining speed and low safety factor of the working face,according to the actual production situation,we have constructed the artificial false top support for the leakage area.According to the actual production,the construction of artificial false top support for the risky leakage area can control the expansion of the risky fall area,prevent the phenomenon of gas accumulation in the risky leakage area,and ensure the working resistance and initial bracing force of the stent in the risky leakage area,which has achieved remarkable application results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49