斜拉式无配重吊篮施工技术研究与应用  被引量:2

Research and Application of Construction Technology of Cable-stayed Hanging Basket Without Counterweight

在线阅读下载全文

作  者:王克 焦本君 朱政 WANG Ke;JIAO Benjun;ZHU Zheng(The Second Construction Limited Company of China Construction Eighth Engineering Division,Jinan 250014,Shandong,China)

机构地区:[1]中建八局第二建设有限公司,山东济南250014

出  处:《建筑施工》2023年第9期1811-1814,共4页Building Construction

摘  要:针对住宅楼、图书馆、场馆等施工周期短的建筑项目,为解决外立面与屋面交叉施工的同时性和安全性,使吊篮安装不再受屋面工程限制,结合建筑外立面施工吊篮技术特点,通过现状调查和综合分析,找出外立面与屋面交叉施工情况下施工周期存在的问题,创新施工吊篮加固形式,选用一种无配重吊篮形式,通过钢丝绳斜拉固定,减少工序制约,节省施工时间,保证施工安全。总结的经验可供类似施工项目参考。For residential buildings,libraries,venues and other construction projects with short construction periods,in order to solve the simultaneity and safety of the cross construction of facade and roof,so that the installation of hanging basket is no longer restricted by the roof project,combined with the technical characteristics of the hanging basket in the construction of building facade,through the investigation and comprehensive analysis of the current situation,the problems existing in the construction period under the cross construction of facade and roof are found out.The construction hanging basket reinforcement form is innovated,and a non-counterweight hanging basket form is selected,which is fixed by wire rope diagonal pulling,so as to reduce process constraints,save construction time and ensure construction safety.The experience summarized can be used as a reference for similar construction projects.

关 键 词:外立面吊篮 施工周期 加固形式 斜拉无配重 

分 类 号:TU755[建筑科学—建筑技术科学]

 