检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏来 焦本君 贾德路 WEI Lai;JIAO Benjun;JIA Delu(The Second Construction Limited Company of China Construction Eighth Engineering Division,Jinan 250014,Shandong,China)
机构地区:[1]中建八局第二建设有限公司,山东济南250014
出 处:《建筑施工》2023年第9期1883-1886,共4页Building Construction
摘 要:为了解决煤矿、矾土矿采空区和活动地震断裂带区域生态修复和园区建设难题,通过地质勘查、采空区勘查、地震安全性评价等措施保障设计和施工安全性,创新“垃圾就地堆山消纳土方平衡”“沉降坑塘整合疏浚引水成湖”“营造微地形生态修复技术”等举措,进行生态修复和建造,实现废弃地的复合再生和永续利用。In order to solve the problems of ecological restoration and park construction in coal mines,bauxite goafs and active seismic fault zones,measures such as geological exploration,goafs exploration and seismic safety evaluation are taken to ensure the safety of design and construction,and innovative measures such as"balance of earthwork absorption by piling garbage on the spot","integrated dredging of subsidence pits and ponds to divert water into lakes"and"ecological restoration technology for building micro-topography"are taken.Ecological restoration and construction are carried out to realize the compound regeneration and sustainable utilization of abandoned land.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.121