检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙剑平[1,2] 孟祥旭 何天武 江宗宝[2] 韩健勇 SUN Jianping;MENG Xiangxu;HE Tianwu;JIANG Zongbao;HAN Jianyong(School of Civil Engineering,Shandong Jianzhu University,Jinan 250101,China;Engineering Research Institute of Appraisal and Strengthening of Shandong Jianzhu University Co.,Ltd.,Jinan 250013,China)
机构地区:[1]山东建筑大学土木工程学院,山东济南250101 [2]山东建筑大学工程鉴定加固研究院有限公司,山东济南250013
出 处:《山东建筑大学学报》2023年第5期17-24,共8页Journal of Shandong Jianzhu University
基 金:山东建筑大学博士科研基金项目(X19080Z);教育部产学合作协同育人项目(202101265002,202101277008)。
摘 要:以某深基坑工程实例为依托,通过双排桩-锚杆支护体系受力特性的现场试验,研究了不同开挖工况下双排桩桩身内力、桩顶位移、土压力、土体深层位移、锚杆内力等变化规律,为双排桩-锚杆支护结构的设计提供参考依据。基于现场工况,建立了双排桩-锚杆支护结构的三维有限元模型,分析了双排桩-锚杆支护结构的力学响应规律。结果表明:桩顶位移和土体深层位移均远小于规范限制位移,对于黄河冲积地层下的深大基坑工程,双排桩-锚杆支护结构具有较好的支护效果;在设置锚杆的状况下,前排桩的弯矩呈S形,后排桩的弯矩呈抛物线形;桩后土压力受开挖深度和时间效应的共同影响显著。Relying on a deep foundation pit engineering example,this study presents systematic field tests to investigate the stress characteristics of a double-row pile-anchor support system,which delves into the variations in internal force,pile top displacement,earth pressure,deep soil displacement,and anchor rod internal force of double-row piles under different excavation conditions,thus providing references for the design of the double-row pile-anchor support structure.At the same time,a three-dimensional finite element model of the double-row pile-anchor support structure is established based on on-site conditions,yielding insights into the mechanical response of this system.The results show that the pile top displacement and deep soil displacement are much smaller than the standard limit displacement,demonstrating the effective support provided by the double-row pile-anchor support structure for deep and large foundation pit projects,especially in alluvial strata of the Yellow River.Furthermore,in the case of setting anchor rods:the front row pile exhibits an S-shaped bending moment,while the rear row pile follows a parabolic pattern.The post-pile earth pressure is significantly affected by the combined effect of excavation depth and time.
关 键 词:深基坑 双排桩-锚杆支护结构 现场试验 有限元方法
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229