检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余大明 杨正华 王铁军 刘波 YU Daming;YANG Zhenghua;WANG Tiejun;LIU Bo(Beneficiation Branch of Pangang Group Mining Co.,Ltd.,Panzhihua 617063,China)
机构地区:[1]攀钢集团矿业有限公司选矿分公司,四川攀枝花617063
出 处:《矿业工程》2023年第5期33-36,共4页Mining Engineering
摘 要:在实际尾矿库闭库中,常出现历史建设程序不合规、排洪能力不足、闭库勘察不合理、闭库施工库尾承载能力不足、闭库后尾矿库安全管理要求不明确等相关问题。在总结攀钢集团矿业有限公司马家田尾矿库闭库管理经验的基础上,分别阐述了上游式尾矿库闭库相关问题并提出解决措施。In the actual cases of closure of tailings storage facilities,issues often occur such as non-compliance with current construction procedures,insufficient flood carrying capacity,unreasonable closure survey,insufficient bearing capacity of the tailings storage facility during closure construction,and unclear safety management requirements for tailings storage facility after closure.The management experience in the closure of Majiatian tailings storage facility of Panzhihua Iron and Steel Group Mining Co.,Ltd.is summarized in this paper,issues relating to closure of upstream type tailings storage facility are elaborated and corresponding solutions are put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7