检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:G.Budi K Nageswara Rao Punit Mohanty
机构地区:[1]Department of Mining Engineering,Indian Institute of Technology(ISM),Dhanbad,826004,India [2]CSIR-Central Institute of Mining and Fuel Research,Dhanbad,826001,India
出 处:《Energy Geoscience》2023年第1期1-12,共12页能源地球科学(英文)
摘 要:The longwall method is one of the feasible and efficient underground mining methods for greater depth of workings.Recently,Singareni Collieries Company Limited(SCCL),the largest coal-producing government company in the Southern part of India,has deployed a high capacity(2×1152T capacity)power support system in its Adriyala Longwall Project(ALP)at a depth of 375 m.There was a concern about the stability of the longwall workings and the protective pillars.Thus,research work was carried out with the geotechnical instruments and numerical modelling tools to analyze the stability while retreating the longwall panels.The outcomes revealed that the convergence in the gate roads increased with the longwall face advancement and the area of exposure.The pressure of the powered support legs on the dip side was less than the rise side legs,which implies a stable roof condition over the longwall face.An abutment zone was identified ahead of the line of extraction up to 10e25 m and presumed from the Factor of Safety(FoS)criterion that within this zone,the longwall pillar possibly will be of better stability at every stage of extraction.The results obtained from this study would be helpful for the mining engineers to understand the behaviour of underground strata in longwall workings.
关 键 词:Adriyala longwall Project(ALP) Strata behaviour Field and numerical modelling
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.45.232