检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李锋[1] 叶婧竹 胡秀芝[1] Li Feng;Ye Jingzhu;Hu Xiuzhi(Sichuan Engineering Technical college,Deyang,Sichuan,618000,China)
机构地区:[1]四川工程职业技术学院建筑系,四川德阳618000
出 处:《装备制造与教育》2023年第3期58-60,共3页Equipment Manufacturing and Education
摘 要:工程量清单计价模式的广泛应用为投标单位实施不平衡报价提供了机会。不平衡报价是投标单位在既不提高总价又不影响中标的前提下,为获取高额利润的重要手段,却是招标单位需要在招投标过程中重点防范的风险。本文从招标者的角度,明确了投标者实施不平衡报价的常见方式,分析了不平衡报价的产生原因,最后针对不同阶段阐述了不平衡报价的具体防范措施。The wide application of the bill of quantities valuation model provides an opportunity for the bidding units to implement the unbalanced quotations.Unbalanced quotation is an important means for bidding units to obtain high profits without increasing the total price and not affecting the winning bid,while it is a risk that tenderers need to guard against in the bidding process.From the perspective of tenderers,this paper aims to clarify the common ways for bidders to implement unbalanced quotations,analyze the causes,and summarize the specific precautions which can be applied at different stages.
分 类 号:TU723.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7