基于退化机器模型的分布式柔性生产系统:性能分析、任务调度及预测性维护  被引量:3

Distributed flexible systems with degenerate machines:Performance analysis,production scheduling,and predictive maintenance

在线阅读下载全文

作  者:黄龙珠 贾之阳 王遵君 田秀璇 HUANG Long-zhu;JIA Zhi-yang;WANG Zun-jun;TIAN Xiu-xuan(School of Automation,Beijing Institute of Technology,Beijing 100081,China;State Key Laboratory of Intelligent Control and Decision of Complex Systems,Beijing Institute of Technology,Beijing 100081,China)

机构地区:[1]北京理工大学自动化学院,北京100081 [2]北京理工大学复杂系统智能控制与决策国家重点实验室,北京100081

出  处:《控制与决策》2023年第9期2641-2652,共12页Control and Decision

基  金:国家自然科学基金项目(62103042);国家重点研发计划项目(2021YFB1714800);北京市自然科学基金项目(4214076)。

摘  要:在近些年的制造环境中,由于市场对多品种、小批量定制产品需求的增加,生产制造更加深入地向着柔性方向发展.如何利用现有资源,提高生产效率,实时地对系统性能进行评估与预测,并对基于小批量生产的实时调度进行优化改进,在分布式柔性生产系统中具有重要的研究意义.因此,基于退化机器模型的多批次串行生产线的性能进行分析,并对分布式生产系统进行任务调度及预测性维护.具体地说,对于具有退化机器模型及有限容量缓冲区的生产系统,首先采用马尔科夫分析方法建立数学模型;随后,提出精确方法来计算此生产系统模型实时的性能指标,并针对该模型下的调度问题,设计最优完成时间指标优化算法;此外,提出基于退化机器模型的预测性维护策略以减少完成时间;最后,通过数值实验验证该算法的可行性和有效性.In the modern manufacturing environment,the production systems develop towards a flexible direction due to the increasing of the market demands of multiple varieties and small batch-based customized products.In order to make better use of existing resources and improve production efficiency,real-time performance evaluation and prediction of real-time scheduling and optimization improvement based on small batch production have important research significance in distributed flexible production systems.This paper mainly studies the performance analysis of multi-batch serial production lines based on degenerate machines,and carries out task scheduling and predictive maintenance for the distributed production system.Specifically,for the production system with the degenerate machine model and the finite capacity buffer,the mathematical model is established using the Markov method firstly.Then,an accurate method is proposed to calculate the real-time performance indexes of the system based on the model,and an algorithm is designed to optimize the completion time index for the scheduling problem under the model.In addition,a predictive maintenance strategy is proposed to reduce the completion time for machines with degradation models.Finally,the feasibility and effectiveness of the mathematical model and algorithm are illustrated by numerical experiments.

关 键 词:分布式调度 智能制造 退化机器 性能评估 暂态分析 预测性维护 

分 类 号:TP273[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象