检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王爱华 WANG Aihua
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2023年第9期57-61,M0007,共6页Urban Roads Bridges & Flood Control
摘 要:以高铁宿迁站集疏运系统为例,分析了高铁站到发交通的交通量需求和时空距离期望,结合高铁站集疏运系统的建设条件和交通特征,研究分析了枢纽区集疏运系统的三种总体布置方案,在综合比较各种方案的功能、景观、经济等主要指标后,推荐“短地道+C形匝道”作为该站集疏运系统的推荐方案。Taking the collecting and distributing system of Suqian High-speed Railway Station as an example,the traffic volume demand and space-time distance expectation of inbound and outbound traffic of high-speed railway station are analyzed.Combined with the construction conditions and traffic characteristics of collecting and distributing system of high-speed railway station,three overall layout schemes of collecting and distributing system in the hub area are studied and analyzed.By comprehensively comparing the main indexes of function,landscape and economy of each scheme,the recommended scheme of“short subway+C-type ramp”is proposed for the collecting and distributing system.
关 键 词:高铁站 枢纽区 集疏运系统 时空距离 落客平台 交通流线
分 类 号:U492.1[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.130