检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ade Gafar Abdullah Mohammad Ali Shafii Syeilendra Pramuditya Topan Setiadipura Kurnia Anzhar
机构地区:[1]Electrical Engineering Study Program,Universitas Pendidikan Indonesia,Bandung,Indonesia [2]Physics Department,Andalas University,Padang,Indonesia [3]Nuclear Science and Engineering Study Program,Bandung Institute of Technology,Indonesia [4]Research Center for Nuclear Reactor Technology,National Research and Innovation Agency,Indonesia [5]Pusat Unggulan Ipteks Perguruan Tinggi,Technical and Vocational Education and Training Research Center(TVET RC),Universitas Pendidikan Indonesia,Indonesia
出 处:《Energy and AI》2023年第4期99-111,共13页能源与人工智能(英文)
摘 要:In terms of planning aspect,nuclear power plant(NPP)development needs analyses,consideration,and right decision making due to multi criteria involved.This study prioritizes the best site development of Indonesian NPPs in terms of 21 social,economic,and technical perspectives which comprise transmission network,oper-ating cost,economic impact,geology,geotechnic,seismology,population density,environment,cooling water,meteorology,hydrology,proximity to hazardous facilities,topography,land use,proximity to wetland,evacu-ation route,security,transportation network,legal consideration,impact of tourism,land ownership,historical places,and public acceptance,all identified to be considerations for the best sites.Two Fuzzy algorithms(Chang’s Extent Analysis and Buckley’s Fuzzy AHP)were used to determine the criteria priorities as well as NPP site feasibility of two locations in Indonesia.The results found that geology,geotechnic,and seismology(SA1);security(SO1),population density(SA2),environment(SA3),and cooling water(SA4)had the highest priorities among the 21 criteria.Based on the 5 top priority criteria,West Kalimantan and East Kalimantan provinces serve as the best candidates for the NPP sites.Such an innovative and novel multi criteria Fuzzy AHP–based decision making(MCDM)approach has been proven to become a useful reference to select NPP sites in Indonesia.
关 键 词:Analytical hierarchy process Fuzzy AHP Multi-criteria decision making Nuclear power plant
分 类 号:P31[天文地球—固体地球物理学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195